• Prior Lake, MNImage 1 of 3: Prior Lake, MN
  • Prior Lake, MNImage 2 of 3: Prior Lake, MN
  • SMSCImage 3 of 3: Prior Lake, MN

Water Treatment Facility
Prior Lake, MN

The construction of the new 6,250 gpm rated water treatment facility with gravity filtration system in Prior Lake included aeration, detention, filtration, clearwell pumping facilities and washwater reclamation facilities. Rice Lake Construction Group furnished and installed mechanical and electrical equipment, yard piping, wiring, a standby generator, instrumentation and control systems. An access road and on-site parking facility were also built.

Previous Page