| Verasun Energy |
Ethanol Project |
Hartley, IA |
$18,870,153 |
| Little Sioux Corn Processors |
80 MGPY Ethanol Plant Expansion |
Marcus, IA |
$750,000 |
| Golden Grain Energy |
Expansion |
Mason City, IA |
$200,000 |
| Green Plains Renewable Energy |
Ethanol Project |
Shenandoah, IA |
$424,200 |
| Big River Resources |
Ethanol Project |
West Burlington, IA |
$192,300 |
| NSP |
Ductbank Work for Forest Elec. at Sherco |
Becker, MN |
$153,543 |
| NSP |
Cherne Concrete Work at NSP |
Becker, MN |
$13,495 |
| NSP |
NSP Fuel Economy |
Becker, MN |
$6,500 |
| NSP |
NSP Commonwealth Ductbank II |
Becker, MN |
$70,946 |
| NSP |
Azco Thrust Blocks at NSP |
Becker, MN |
$23,828 |
| NSP |
NSP Superstructures Phase II - Sherco |
Becker, MN |
$14,314,847 |
| NSP |
NSP Commonwealth Ductbank |
Becker, MN |
$310,207 |
| 3M |
3M Cottage Grove Neutralization Upgrade |
Cottage Grove, MN |
$858,491 |
| 3M |
3M Chemolite Exit Corridor/ADA Upgrade |
Cottage Grove, MN |
$170,149 |
| 3M |
3M Safety Transporation Center |
Cottage Grove, MN |
$1,299,850 |
| Ashland Petroleum |
Ashland Oil Tank Farm |
Cottage Grove, MN |
$1,876,136 |
| 3M |
3M Chemolite WWTF Expansion |
Cottage Grove, MN |
$1,967,508 |
| US Corp of Engineers |
Earth Dam Repairs Lock #2 |
Hastings, MN |
$2,470 |
| US Corp of Engineers |
Lock & Dam #2 |
Hastings, MN |
$6,973,597 |
| City of Hutchinson |
HTI 2005 Chemical Storage Add. |
Hutchinson, MN |
$279,750 |
| 3M |
3M Tartan Park Door Replacement Ph. 2 |
Lake Elmo, MN |
$26,700 |
| 3M |
3M Tartan Park |
Lake Elmo, MN |
$28,300 |
| Honeywell |
Honeywell Water Tank - Brown Mpls. |
Minneapolis, MN |
$70,314 |
| NSP |
NSP Riverside Demolition |
Minneapolis, MN |
$33,270 |
| NSP |
NSP Ash Mods II |
Red Wing, MN |
$3,896 |
| NSP |
NSP Ash Handling Modifications |
Red Wing, MN |
$82,182 |
| Koch Refining Co. |
Koch P-20 Pit |
Rosemount, MN |
$146,616 |
| Koch Refining Co. |
Koch Storm Sewer Retention |
Rosemount, MN |
$903,297 |
| Koch Refining Co. |
Koch Unit 26 Drilled Piers |
Rosemount, MN |
$10,870 |
| Koch Refining Co. |
Koch Misc. Contract Work 2/96-1/97 |
Rosemount, MN |
$2,762,771 |
| Koch Refining Co. |
Koch Vehicle Storage Building |
Rosemount, MN |
$652,876 |
| Ashland Petroleum |
Williams Pipe Line Grouting |
Rosemount, MN |
$19,500 |
| Koch Refining Co. |
Koch Main Control Building |
Rosemount, MN |
$2,762,771 |
| Koch Refining Co. |
Koch Misc. Concrete Work 1995-1996 |
Rosemount, MN |
$558 |
| Koch Refining Co. |
Koch Misc. Contract Work 1994 |
Rosemount, MN |
$38,866 |
| Ashland Petroleum |
Williams Pipeline for Pioneer Power |
Rosemount, MN |
$41,473 |
| Koch Refining Co. |
Koch Turnaround Trailer |
Rosemount, MN |
$2,071 |
| Koch Refining Co. |
Koch Light Pole |
Rosemount, MN |
$3,200 |
| Koch Refining Co. |
Koch Pumphouse & Foundations |
Rosemount, MN |
$191,384 |
| Koch Refining Co. |
Koch Misc. Work 1993 |
Rosemount, MN |
$1,699 |
| Koch Refining Co. |
Koch Nitrogen Vaporizer Foundation |
Rosemount, MN |
$14,880 |
| Koch Refining Co. |
Koch Elec. Pull Box & Piers |
Rosemount, MN |
$6,200 |
| Koch Refining Co. |
Koch Unit 21 Coke Phase 1 & 2 |
Rosemount, MN |
$1,543,317 |
| Koch Refining Co. |
Koch Unit 21 Coke Handling |
Rosemount, MN |
$5,997 |
| Koch Refining Co. |
Koch MTBE Offsite Pump Foundation |
Rosemount, MN |
$54,976 |
| Koch Refining Co. |
Extra Work at Koch for Gagnon |
Rosemount, MN |
$1,200 |
| Koch Refining Co. |
Koch Base Plate Grouting |
Rosemount, MN |
$1,560 |
| Koch Refining Co. |
Koch North Flare Activation |
Rosemount, MN |
$35,193 |
| Koch Refining Co. |
Koch 4th St. Truss Rack |
Rosemount, MN |
$186,366 |
| Koch Refining Co. |
Koch Misc. Work 1993 |
Rosemount, MN |
$9,258 |
| Koch Refining Co. |
Koch Unit 32 Splitter Pipe |
Rosemount, MN |
$19,425 |
| Koch Refining Co. |
Koch Unit 32 Recycle Gas Compressor |
Rosemount, MN |
$327,789 |
| Koch Refining Co. |
Koch Air Comp Ductbank |
Rosemount, MN |
$74,593 |
| Koch Refining Co. |
Koch Alky Re-Boiler |
Rosemount, MN |
$33,762 |
| Koch Refining Co. |
Clean Fuels Unit 27 Piperack Fireproofing |
Rosemount, MN |
$2,642,690 |
| Koch Refining Co. |
Koch Air Comp/Lube Oil Bldg. |
Rosemount, MN |
$105,445 |
| Koch Refining Co. |
Civil Work for Cherne |
Rosemount, MN |
$123,104 |
| Koch Refining Co. |
Clean Fuels Foundation for Cherne |
Rosemount, MN |
$5,411,149 |
| Koch Refining Co. |
Flare Expansion Fireproofing for Cherne |
Rosemount, MN |
$87,500 |
| Koch Refining Co. |
Koch WWTP Control Bldg. Lab |
Rosemount, MN |
$825,982 |
| Koch Refining Co. |
Koch WWTP Polyblend Addition |
Rosemount, MN |
$15,470 |
| Koch Refining Co. |
Koch Annex II |
Rosemount, MN |
$79,383 |
| Koch Refining Co. |
Koch Misc. Work - 1992 |
Rosemount, MN |
$8,675 |
| Koch Refining Co. |
Koch Feed Exchanger Unit 37 |
Rosemount, MN |
$35,545 |
| Koch Refining Co. |
Koch Deaerator Foundation for Flare Exp. |
Rosemount, MN |
$167,946 |
| Koch Refining Co. |
Koch FCC Control Building |
Rosemount, MN |
$6,073 |
| Koch Refining Co. |
Koch Annex Building 112 |
Rosemount, MN |
$144,204 |
| Koch Refining Co. |
Koch Bottom Load Add. Foundation |
Rosemount, MN |
$17,959 |
| Koch Refining Co. |
Koch UG Ductbank & Drilled Piers |
Rosemount, MN |
$70,933 |
| Koch Refining Co. |
Koch B Street Piperack |
Rosemount, MN |
$162,434 |
| Koch Refining Co. |
Koch Oily Vessel Fireproofing |
Rosemount, MN |
$8,782 |
| Koch Refining Co. |
Koch Concrete Sumps |
Rosemount, MN |
$18,837 |
| Koch Refining Co. |
Koch Unit 25 Control Building |
Rosemount, MN |
$245,134 |
| Koch Refining Co. |
Koch Misc. Work - 1991 |
Rosemount, MN |
$14,684 |
| Koch Refining Co. |
Koch FCC Valve Box Lid |
Rosemount, MN |
$2,501 |
| Koch Refining Co. |
Koch Tank 414 |
Rosemount, MN |
$950 |
| Koch Refining Co. |
Koch Mechanical Repair Shop Addition |
Rosemount, MN |
$684,177 |
| Koch Refining Co. |
Koch Shop 2 Metal Building |
Rosemount, MN |
$92,191 |
| Koch Refining Co. |
Koch Hand Excavation II |
Rosemount, MN |
$20,195 |
| Koch Refining Co. |
Koch Oak Door |
Rosemount, MN |
$3,218 |
| Koch Refining Co. |
Koch 31 Unit Foundations |
Rosemount, MN |
$3,570 |
| Koch Refining Co. |
Koch Block-up Windows |
Rosemount, MN |
$2,930 |
| Koch Refining Co. |
Koch Piers at O/W Separator |
Rosemount, MN |
$31,460 |
| Koch Refining Co. |
Gombold Electric Work at Koch Refinery |
Rosemount, MN |
$3,106 |
| Koch Refining Co. |
Koch Hand Excavation at Dike |
Rosemount, MN |
$83,762 |
| Koch Refining Co. |
Koch Folding Partitions |
Rosemount, MN |
$16,000 |
| Koch Refining Co. |
Koch Final Clarifier Foundation |
Rosemount, MN |
$64,691 |
| MN Rebar |
MN Rebar Shear Foundation Replacement |
Rosemount, MN |
$2,737 |
| Koch Refining Co. |
Koch Misc. Work - 1990 |
Rosemount, MN |
$26,383 |
| Koch Refining Co. |
Koch Telephone Conduit |
Rosemount, MN |
$8,200 |
| MN Rebar |
MN Rebar Slab Replacement |
Rosemount, MN |
$812 |
| Koch Refining Co. |
Koch Pipe Rack Foundations |
Rosemount, MN |
$11,800 |
| Koch Refining Co. |
Koch Concrete Manholes & Slabs |
Rosemount, MN |
$31,117 |
| Koch Refining Co. |
Koch Centrifuge Slab |
Rosemount, MN |
$4,900 |
| SKB |
SKB Landfill Concrete Slab for Hentges |
Rosemount, MN |
$2,000 |
| Koch Refining Co. |
Koch Blender to Analyzer Bldg. |
Rosemount, MN |
$243,030 |
| Koch Refining Co. |
Drilled Piers for Cherne at Koch |
Rosemount, MN |
$1,000 |
| Koch Refining Co. |
Koch Blender Ductbank |
Rosemount, MN |
$81,007 |
| Koch Refining Co. |
Koch WWTP Basin 94B-2C |
Rosemount, MN |
$90,888 |
| Koch Refining Co. |
Koch Misc. Work 1989 |
Rosemount, MN |
$2,465 |
| Koch Refining Co. |
Koch Gas Distillate Blender |
Rosemount, MN |
$340,616 |
| Koch Refining Co. |
Koch Mechanical Room Addition |
Rosemount, MN |
$29,800 |
| Koch Refining Co. |
Koch Rev. Osmosis Ductbank |
Rosemount, MN |
$44,794 |
| Koch Refining Co. |
Koch WWTP Storage Basin |
Rosemount, MN |
$145,042 |
| Koch Refining Co. |
Koch Fire Hydrant C |
Rosemount, MN |
$1,855 |
| Ford Motor Co. |
Ford Bumpy Road |
Rosemount, MN |
$6,550 |
| Ford Motor Co. |
Ford Car Wash |
Rosemount, MN |
$15,900 |
| Koch Refining Co. |
Koch Unit 14 Light Slop Oil |
Rosemount, MN |
$74,126 |
| Koch Refining Co. |
Koch Tank Farm - Various Tanks |
Rosemount, MN |
$187,100 |
| Koch Refining Co. |
Cherne Fireproof at Vessel 25v-27 |
Rosemount, MN |
$680 |
| Koch Refining Co. |
Koch Pioneer Power |
Rosemount, MN |
$155,700 |
| Koch Refining Co. |
Koch #3 Pump Area Paving |
Rosemount, MN |
$4,000 |
| Koch Refining Co. |
Koch Unit #14 TCC Gas Recovery |
Rosemount, MN |
$1,154,200 |
| Koch Refining Co. |
Koch Ductbank for Cooling Tower #6 |
Rosemount, MN |
$137,300 |
| Koch Refining Co. |
Koch W Tank Farm Piperack |
Rosemount, MN |
$336,497 |
| Koch Refining Co. |
Koch Misc. Work 1988 |
Rosemount, MN |
$8,623 |
| Truck Crane Service |
Crane Anchors at Koch |
Rosemount, MN |
$14,388 |
| Koch Refining Co. |
Koch Hi-Cetane Pipe Support |
Rosemount, MN |
$33,218 |
| Koch Refining Co. |
Koch Cooling Tower #6 |
Rosemount, MN |
$139,629 |
| Koch Refining Co. |
Koch Unit 18 Gas Plant Addition |
Rosemount, MN |
$1,341,097 |
| Koch Refining Co. |
Koch Tank 33 & 412 Ringwall |
Rosemount, MN |
$8,745 |
| Koch Refining Co. |
Koch Drains at S.W.S. #38 |
Rosemount, MN |
$1,653 |
| MN Rebar |
MN Rebar Office Expansion |
Rosemount, MN |
$15,087 |
| Koch Refining Co. |
Koch #3 Crude Unit Phase I |
Rosemount, MN |
$487,321 |
| Koch Refining Co. |
Koch Fireproof at Old #23 |
Rosemount, MN |
$10,500 |
| Koch Refining Co. |
Koch Retaining Wall Add at #23 |
Rosemount, MN |
$12,399 |
| Koch Refining Co. |
Koch Sulphur Area S.O.G. |
Rosemount, MN |
$13,789 |
| Koch Refining Co. |
Koch Excavating Pipe Work |
Rosemount, MN |
$7,679 |
| Koch Refining Co. |
Koch Pipe Bridge Foundation |
Rosemount, MN |
$3,800 |
| Koch Refining Co. |
Koch Lester Building |
Rosemount, MN |
$43,029 |
| Koch Refining Co. |
Koch Fireproof #23 |
Rosemount, MN |
$58,526 |
| Koch Refining Co. |
Koch Pump Foundations |
Rosemount, MN |
$5,500 |
| Koch Refining Co. |
Koch Heater Foundations |
Rosemount, MN |
$85,332 |
| Koch Refining Co. |
Koch Retaining Wall |
Rosemount, MN |
$38,800 |
| Koch Refining Co. |
Koch WWTP Slag |
Rosemount, MN |
$3,800 |
| Koch Refining Co. |
Koch Foundation 32V-94 |
Rosemount, MN |
$3,500 |
| MN Rebar |
MN Rebar Office Remodel |
Rosemount, MN |
$10,870 |
| Koch Refining Co. |
Koch Penex Shoring |
Rosemount, MN |
$2,638 |
| Koch Refining Co. |
Koch Penex Catch Basins |
Rosemount, MN |
$4,374 |
| Koch Refining Co. |
Koch Fireproof Sour Water |
Rosemount, MN |
$12,800 |
| Koch Refining Co. |
Koch Penex Demolition |
Rosemount, MN |
$83,498 |
| Koch Refining Co. |
Koch Penex Unit |
Rosemount, MN |
$1,504,469 |
| MN Rebar |
MN Rebar Equipment Installation II |
Rosemount, MN |
$22,403 |
| Koch Refining Co. |
Koch Ringwall |
Rosemount, MN |
$52,800 |
| Koch Refining Co. |
Koch Lube Oil Storage |
Rosemount, MN |
$945 |
| MN Rebar |
MN Rebar Equipment Installation |
Rosemount, MN |
$14,825 |
| Koch Refining Co. |
Koch Sidewalks |
Rosemount, MN |
$2,200 |
| Koch Refining Co. |
Koch Fireproofing Aviation |
Rosemount, MN |
$6,500 |
| Koch Refining Co. |
Koch Fireproofing #41 |
Rosemount, MN |
$88,900 |
| Koch Refining Co. |
Koch Fireproofing #19 |
Rosemount, MN |
$25,900 |
| Koch Refining Co. |
Koch Trench Work |
Rosemount, MN |
$5,000 |
| Koda Energy, LLC |
Power Plant |
Shakopee, MN |
$3,109,700 |
| Rahr Malting Company |
Glycol Piping |
Shakopee, MN |
$2,974,562 |
| Stroh's |
Stroh's Filter Separator - Pioneer Power |
St. Paul, MN |
$57,587 |
| District Energy |
District Energy Turbine Base Grouting |
St. Paul, MN |
$1,500 |
| NSP |
NSP Line / Pioneer Power |
St. Paul, MN |
$99,086 |
| 3M |
Ductbank at 3M/Commonwealth |
St. Paul, MN |
$7,591 |
| Ford Motor Co. |
Ford AGC Floor Replacement |
St. Paul, MN |
$6,800 |
| Ford Motor Co. |
Ford Bumpy Road II |
St. Paul, MN |
$13,000 |
| Ford Motor Co. |
Ford Exhaust Fan Trench |
St. Paul, MN |
$8,200 |
| Ford Motor Co. |
Ford Warehouse Paving |
St. Paul, MN |
$40,350 |
| Ford Motor Co. |
Ford Tedlar Pit |
St. Paul, MN |
$48,500 |
| Ford Motor Co. |
Ford Frame Yard Paving |
St. Paul, MN |
$2,290 |
| Ford Motor Co. |
Ford Spray Booth |
St. Paul, MN |
$9,725 |
| Ford Motor Co. |
Ford Guard Posts |
St. Paul, MN |
$1,673 |
| Ford Motor Co. |
Ford Remove & Repair Ramps |
St. Paul, MN |
$5,100 |
| 3M |
3M Grouting Work for Pioneer Power |
St. Paul, MN |
$2,459 |
| Ford Motor Co. |
Ford Cafeteria Service Line |
St. Paul, MN |
$19,056 |
| Ford Motor Co. |
Underground Storage Tank - Ford |
St. Paul, MN |
$194,311 |
| Ford Motor Co. |
Ford Engine Line Trench |
St. Paul, MN |
$4,500 |
| Ford Motor Co. |
Ford CAI Inspection Pit |
St. Paul, MN |
$3,940 |
| Ford Motor Co. |
Ford Tedlar Pit Expansion |
St. Paul, MN |
$33,800 |
| Ford Motor Co. |
Ford Mash Welder Pit |
St. Paul, MN |
$8,000 |
| Ford Motor Co. |
Ford Retaining Wall |
St. Paul, MN |
$29,940 |
| Ashland Petroleum |
Ashland FCC Unit Operators Building |
St. Paul Park, MN |
$258,900 |
| Ashland Petroleum |
Ashland Hydrogen Electrical |
St. Paul Park, MN |
$13,793 |
| Ashland Petroleum |
Ashland Amine Hydrogen Elec. Work |
St. Paul Park, MN |
$85,643 |
| Ashland Petroleum |
Ashland Clean Fuels Mod #4 |
St. Paul Park, MN |
$177,046 |
| Ashland Petroleum |
Ashland SRU SCOT Electrical |
St. Paul Park, MN |
$32,120 |
| Ashland Petroleum |
Ashland Warehouse |
St. Paul Park, MN |
$1,203,700 |
| Ashland Petroleum |
Ashland Precast Pipe Support |
St. Paul Park, MN |
$195,194 |
| Ashland Petroleum |
Ashland Fire Hall Addition |
St. Paul Park, MN |
$108,046 |
| Ashland Petroleum |
Ashland Oil East Tank Farm - St. Paul Park |
St. Paul Park, MN |
$1,408,934 |
| NSP |
Norenco Steam Line at King Plant |
Stillwater, MN |
$1,979,831 |
| NSP |
NSP R-1 Tunnel Extension-King Plant |
Stillwater, MN |
$233,454 |
| Verasun Energy |
Ethanol Project |
Welcome, MN |
$17,516,504 |
| ASA |
ASA 100 MGPY Ethanol Plant |
Fairmont, NE |
|
| Val-E Ethanol |
40 MGPY Ethanol Plant |
Ord, NE |
$175,000 |
| Verasun Energy |
Ethanol Project |
Marion, SD |
$365,200 |
| |
Ethanol Project |
Redfield, SD |
$300,000 |
| US Corp of Engineers |
Alma Lock & Dam Sill Repair |
Alma, WI |
$38,867 |
| 3M |
3M Advanced Ceramic Move |
Cumberland, WI |
$696,001 |
| Koch Refining Co. |
Cherne Fireproofing |
Hudson, WI |
$28,000 |
| Koch Refining Co. |
Koch Off-Site Fireproofing |
Hudson, WI |
$173,400 |
| NSP |
NSP Hydro Development Project |
Jim Falls, WI |
$1,579,545 |
| 3M |
3M Dock Containment |
Menomonie, WI |
$46,367 |
| 3M |
3M - ADA Upgrade |
Menomonie, WI |
$23,060 |
| 3M |
3M Resin Storage Building |
Menomonie, WI |
$423,414 |
| Castle Rock Renewable Fuels |
Ethanol Project |
Necedah, WI |
$1,100,000 |